When you can not find a loft downtown just to buy land in suburbs and have it build a shed with metal roof installed and insulated. It'll just be grafting a classic wood frame.
In the case of this construction in 2006 near Bordeaux (300 m2) This timber frame was oversized because there are half a level and a large crawl space.
The floor is 22mm chipboard wood waterproof, complies with DTU and carried by 25cm by 10cm planks about 4 range.
Foundations took about 3-4 days drying time of a month. Framing and insulated roof was laid in two weeks, the rest of the site was done in self to 2 people (all part wood, shutters, partitions, floors, walls, siding) and reinforcement on single or multiple positions the competence of customers.